I am a little disappointed. My condo unit is not offered an upgrade M&E package because the structural walls have been constructed. Why didn’t the marketing team propose this option earlier?

What are the implications? The structure of the condominium is shear wall meaning: the openings for any wiring and ducting has to be predetermined earlier before they cast the wall.

Hence, any future additional electrical power points or air-conditioning piping has to be done externally on the walls.

Oh well, on the bright side, I do not have to think of forking out another 2k for a few additional power points and 2 air-con point for now.